Unknown Company

QA/QC Inspector – Data Center Construction (Travel) (Frederick)

frederick, md • Posted 6 days ago
Onsite Full Time nan

Essel Skilled Trades is hiring QA/QC inspectors for large data center construction projects. You'll inspect electrical and mechanical installs, test equipment against spec, and keep quality records in order ahead of startup.


What you'll do:

- Inspect electrical and mechanical installs against drawings and specs

- Test installed equipment and keep testing gear calibrated

- Photograph, log and report deficiencies, then re-check once fixed

- Keep inspection reports, checklists and non-conformance records current

- Give daily progress updates to the site supervisor


Must-haves:

- 3–5 years in QA/QC, inspection, commissioning, or electrical/mechanical construction

- Able to read construction drawings and specs

- Working knowledge of test equipment; comfortable with Excel and Microsoft Office

- US citizen

- Able to travel 75%+ of the time

- Must pass background check, drug screen, and driving record check


Pay: $32–$60/hr, depending on experience

Type: Temp-to-hire, full-time

Travel: 75%+


Apply on LinkedIn with your resume. Qualified candidates will be contacted for a phone screen.

QA/QC Inspector – Data Center Construction (Travel) (Frederick) in frederick at Unknown Company

Typical pay
$52,343–$57,200

For context, most quality inspectors earn between $52,343–$57,200 a year according to Bureau of Labor Statistics wage data. What this particular role pays is set by the employer — check the description above.

This position is listed as full time and onsite.

Back to Job Search