Unknown Company

Data Center Tech

miami, fl • Posted 1 weeks ago
Onsite Full Time General

Data Center TechFusion Solutions is looking for a Data Center Tech for a client in Fort Lauderdale, FL and Miami, FL. The job requires one day in each market. The pay rate is $40.00/hr for 1099 status.

The start date is 07/18 and 07/19 for one job in each city per day. Resources needed: 1. Duration: 1 day work in each market.

Fort Lauderdale, FL and Miami, FL (Boca Raton can be the hub for someone). You provide a small amount of Clear Flame-Retardant Heat Shrink. The client provides lugs, power cable, grounding cable, GMT fuses, PTAGs, lacing twine, and fish paper.Scope:Cisco ASR920 router (boca-t-dcn-01r) should have already been installed to Arelion CAB CG position RU10Run new and connect DC power cables to 1X 2A/VDC 1A/1B, DC-PNL-2A-CG .RU35 GMT A3/B3 (GMT 5A fuses with 14-AWG WIRE)Only one DC power supply is available at this time, please leave the second power cable hanging to be connected in a few weeks.

We will leave the breaker turned off on the DC Panel for the B Feed and tape up the lugsLabel power cables with A and Z end with P-TagsPower on the device and verify green LEDs are on Arista after chassis is powered up and both power feeds are workingAlign Tx/Rx for the following patches, label with ICB# and A/Z positions ICB- (cat6) (CG /11/RU10 boca-t-dcn-01r port 0/22 (CG /11/RU22 BOCA/T RLS 01 port WSC-1Checklist:Cables ran correctly?BO fiber cables should be ran on the ladder rack and to the back of the BO ODF. While the duplex fibers are ran in the over-head fiber tray.BO fiber cables should be dressed in using lacing cord and or Velcro, along with fish paper.Do not hide cable slack in the racks/cabinets and it's vertical wire managers; any slack should be put in the over-head fiber tray.All cables should have a nice 90 degree bend from the vertical wire manager to the network device.All cables including power should be labeled at both ends (A and Z location with port information, ICB and or IC #).Install and dress copper cables on ladder rack; copper cables should not be ran in the overhead fiber tray.Tidy up existing fibers (pull up extra slack to the over-head fiber tray, bundle fibers together with Velcro in vertical wire managers and each chassis slot).General site cleanup; throw trash away and make sure all empty boxes are properly removed from the site.Provide pictures to the Implementation Engineer so they can be reviewed.

Data Center Tech in miami at Unknown Company

This position is listed as full time and onsite.

Back to Job Search