Datacenter People is a specialized recruitment company working with the leading data center commissioning and quality services firms in the world.
Our client serves as an owner's representative, specializing in Data Center commissioning and QA/QC services.
The Role
- Provide engineering and technical support to plan, schedule, coordinate and execute full life cycle commissioning of critical facilities.
- Witnesses the static and dynamic testing of complex electrical/mechanical systems.
- Perform Test Procedures.
- Conduct site observation surveys and prepares field reports on the status of projects and completion of projects with respect to compliance to the plans and specifications.
- Prepare punch list reports and determines corrective measures for on-site problems.
- Prepare general condition survey reports.
- Familiarise oneself with codes, local project regulations, construction practices and the latest equipment functional concepts.
- Obey all the projects safety requirements including specific on-site regulations.
- Act as project coordinator with other field engineers, coordinating printing, presentation and administration procedures.
- Review shop drawings and submittals.
The Experience Profile
- Experience of commissioning electrical/mechanical systems in a data center or large commercial/industrial setting – typically 500kVA or above. OR Experience in a senior commissioning role with the ability to interpret the same, in lieu of this a technical background.
- Ability to determine and interpret data from various sources such as external PQM waveforms, data logs etc.
- Ability to determine pass/fail criteria.
- Conversant in data center topologies across varied designs: N+1, N+2, 2N etc.
- Fault finding/trouble-shooting knowledge of various integrated systems such as HVAC, chillers, CRAC units, refrigeration systems, UPS systems, generators, switchgear
- Working knowledge of network and communications – Modbus/ethernet, SCADA systems etc.
- Understanding of data center commissioning levels and the requirements to move from level-to-level.
- Knowledge of scheduling/planning/reporting.
𝘞𝘦 𝘳𝘦𝘨𝘳𝘦𝘵 𝘵𝘩𝘢𝘵 𝘥𝘶𝘦 𝘵𝘰 𝘵𝘩𝘦 𝘩𝘪𝘨𝘩 𝘷𝘰𝘭𝘶𝘮𝘦 𝘰𝘧 𝘢𝘱𝘱𝘭𝘪𝘤𝘢𝘵𝘪𝘰𝘯𝘴 𝘸𝘦 𝘢𝘳𝘦 𝘶𝘯𝘢𝘣𝘭𝘦 𝘵𝘰 𝘢𝘤𝘬𝘯𝘰𝘸𝘭𝘦𝘥𝘨𝘦 𝘦𝘢𝘤𝘩 𝘰𝘯𝘦. 𝘗𝘭𝘦𝘢𝘴𝘦 𝘣𝘦𝘢𝘳 𝘪𝘯 𝘮𝘪𝘯𝘥 𝘵𝘩𝘢𝘵 𝘪𝘧 𝘺𝘰𝘶 𝘢𝘳𝘦 𝘴𝘦𝘭𝘦𝘤𝘵𝘦𝘥 𝘧𝘰𝘳 𝘪𝘯𝘵𝘦𝘳𝘷𝘪𝘦𝘸 𝘸𝘦 𝘸𝘪𝘭𝘭 𝘤𝘰𝘯𝘵𝘢𝘤𝘵 𝘺𝘰𝘶 𝘸𝘪𝘵𝘩𝘪𝘯 𝘵𝘩𝘦 𝘯𝘦𝘹𝘵 𝘴𝘦𝘷𝘦𝘯 𝘥𝘢𝘺𝘴.
Field Service Engineer - Commissioning in plano at Unknown Company
This position is listed as full time and onsite.