Unknown Company

Energy Marshal - Data Center Construction

atlanta, georgia • Posted 4 days ago
Onsite Contract Construction
Job Description Job Description

Job Overview

We are seeking experienced Energy Marshals for potential large-scale data center construction opportunities in the Atlanta, Georgia area.


This position is ideal for an electrical safety professional with extensive experience managing hazardous energy control, Lockout/Tagout (LOTO) procedures, electrical isolation, and controlled energization activities on complex mission-critical construction projects.

The ideal candidate has previous experience serving as a designated Energy Marshal or in a comparable position with direct responsibility for electrical isolation and energization safety.


Key Responsibilities

  • Oversee hazardous energy control and electrical isolation procedures.
  • Coordinate and verify Lockout/Tagout (LOTO) requirements during construction, testing, and commissioning.
  • Review energy isolation plans, switching procedures, and applicable energization permits.
  • Coordinate controlled energization activities with authorized personnel, electrical contractors, equipment manufacturers, and commissioning teams.
  • Verify appropriate electrical safety boundaries, isolation points, and documentation.
  • Ensure compliance with OSHA regulations, NFPA 70E, and project-specific electrical safety requirements.
  • Participate in pre-energization meetings, safety reviews, and readiness assessments.
  • Identify hazardous energy risks and address unsafe conditions.
  • Maintain detailed records of electrical isolation, testing, approvals, and release procedures.
  • Support safe transitions from construction through equipment testing, commissioning, and system turnover.


Required Qualifications

  • 5+ years of electrical construction, electrical safety, commissioning, or critical power systems experience preferred.
  • Demonstrated responsibility for hazardous energy control and electrical isolation programs.
  • Strong understanding of NFPA 70E and OSHA electrical safety requirements.
  • Experience with medium-voltage distribution equipment, switchgear, transformers, and electrical power systems.
  • Familiarity with switching procedures, electrical isolation, and energization protocols.
  • Ability to interpret electrical one-line diagrams and identify isolation points.
  • Experience coordinating electrical safety activities across multiple contractors.
  • Strong communication, documentation, and risk-management skills.


Preferred Qualifications

  • Previous formal appointment as an Energy Marshal or Authorizing Energy Marshal.
  • Hyperscale data center construction or commissioning experience.
  • Experience managing electrical isolation boundaries and energization procedures.
  • Familiarity with UPS systems, generators, switchgear, and critical power distribution.
  • OSHA 30 certification and relevant electrical safety training.


What This Opportunity Offers

  • Highly competitive compensation based on qualifications.
  • Opportunities to work on major mission-critical construction projects.
  • High-responsibility electrical safety leadership role.
  • Exposure to sophisticated electrical infrastructure and commissioning operations.
  • Potential for long-term opportunities within the data center construction industry.
Company Description

Representing a Confidential Company

Company Description Representing a Confidential Company

Energy Marshal - Data Center Construction in atlanta at Unknown Company

This position is listed as contract and onsite.

Back to Job Search