Worley is seeking a Cost Controller for our Bryan–College Station, Texas office. You will coordinate overall cost performance on major complex projects, ensure the preparation and accuracy of project cost reports, and liaise with project management and clients on cost control matters.
The role requires a University Degree or equivalent, on-site work, and oversight of staff performing cost analysis, with periodic site visits to verify field cost reporting.
#J-18808-LjbffrEarned Value Lead: Major Projects Cost Control in college station at Unknown Company
This position is listed as full time and onsite.