Unknown Company

Data Center Construction Director

washington, dc • Posted Today
Onsite Contract Design & Development

Multiple Locations: Houston, TX or Washington, D.C. Metropolitan Area (initial base), with transition to Project Site(s)

Company: Fortune 500 Energy Company

Position Overview

We are seeking an experienced Data Center Construction Director to lead the planning, execution, and delivery of large-scale data center construction projects. This role will initially be based in the Washington, D.C. metropolitan area, with a planned transition to project site(s) as projects advance. The successful candidate will oversee multi-million to multi-billion dollar capital projects, ensuring on-time, on-budget delivery while meeting rigorous safety, quality, sustainability, and operational standards for a leading Fortune 500 energy company.

Key Responsibilities

  • Lead end-to-end construction delivery of hyperscale and enterprise data center projects, from site selection and early design through commissioning and handover.
  • Develop and manage overall project execution strategies, schedules, budgets, risk registers, and contingency plans.
  • Oversee general contractors, design firms, specialty trade partners, and internal cross-functional teams (engineering, power, cooling, IT, operations, legal, and EHS).
  • Ensure strict adherence to safety protocols, quality standards, building codes, and company ESG/sustainability requirements.
  • Manage complex interfaces including high-voltage power delivery, electrical distribution, mechanical systems (chilled water, free cooling, etc.), structural, civil, and low-voltage/IT infrastructure.
  • Drive value engineering, constructability reviews, and continuous improvement while protecting schedule and cost.
  • Serve as the primary construction lead for owner-side decision-making; escalated issues and recommend solutions to senior leadership.
  • Coordinate permitting, utility interconnects, and local/state regulatory requirements across jurisdictions.
  • Build and lead high-performing project teams; mentor construction managers and site leadership.
  • Maintain strong relationships with key external partners and internal stakeholders while representing the company professionally in the field and in executive forums.
  • Support the transition of completed facilities to operations teams and capture lessons learned for future programs.
  • Travel as required between the D.C. area, Louisiana project sites, and other locations.

Required Qualifications

  • Bachelor’s degree in Construction Management, Civil/Mechanical/Electrical Engineering, or related field (Master’s preferred).
  • 15+ years of progressive construction experience, with at least 8–10 years in data center, mission-critical, or large industrial/energy infrastructure projects.
  • Proven track record delivering complex, large-scale data center or similar mission-critical facilities (preferably hyperscale).
  • Strong technical understanding of data center critical systems: power (UPS, generators, switchgear, medium/high voltage), mechanical/cooling, structural, and IT infrastructure.
  • Demonstrated success managing budgets, schedules, and multi-contractor environments on projects of significant scale.
  • Experience leading owner-side or construction management teams on capital projects.
  • Excellent leadership, communication, negotiation, and stakeholder management skills.
  • Willingness and ability to travel frequently and work in active construction environments.
  • Professional Engineer (PE) license or equivalent preferred but not required.

Preferred Qualifications

  • Experience with Fortune 500 or large energy/utility company capital programs.
  • Experience with modular, prefabricated, or rapid-deployment data center construction methods.
  • Knowledge of sustainability standards (LEED, energy efficiency, water stewardship) relevant to data centers.
  • PMP, CCM, or similar project management certification.
#J-18808-Ljbffr

Data Center Construction Director in washington at Unknown Company

This position is listed as contract and onsite.

Back to Job Search